High Quality Products Can Be Purchased.
You are here: Home » News » Guide To The Best Brewery Floor Plan Designs

Guide To The Best Brewery Floor Plan Designs

Views: 37     Author: Site Editor     Publish Time: 2025-08-12      Origin: Site

The core value of brewery floor plans


Optimize space utilization

  • Precisely plan every inch of available space

  • Ensure seamless production processes

  • Increase efficiency by over 30%


Ensure compliance

  • Meet local building codes

  • Meet food safety standards

  • Pass fire safety inspections


Improve user experience

  • Optimize customer flow

  • Create a comfortable dining environment

  • Showcase the brewing process


start brewery-min


Functional areas that must be included in a floor plan


Brewery production area

  • Mashing system layout

  • Fermentation tank arrangement

  • Cooling equipment location


Packaging and labeling area

  • Bottling line design

  • Labeling workstation

  • Finished product staging area


Raw material storage area

  • Grain storage plan

  • Hops refrigeration room

  • Ingredient storage racks


Tasting and sales area

  • Bar design essentials

  • Tasting counter configuration

  • Retail display cabinets


Ancillary areas

  • Staff lounge

  • Restaurant configuration

  • Equipment room


beer-brewing-process


Key Considerations for Professional Design


Hydraulic System Planning

  • Water Inlet Pipe Diameter Calculation

  • Drainage Slope Design (Recommended ≥2%)

  • CIP Cleaning Point Layout


Power Supply Plan

  • Equipment Power Load Analysis

  • Emergency Power Supply Configuration

  • Optimal Distribution Box Location


Ventilation and Temperature Control

  • Fermentation Room Air Conditioner Selection

  • CO₂ Emission Control

  • Dehumidification Plan for Hot and Humid Areas


Personnel and Logistics Separation

  • Raw Material Intake Routes

  • Finished Product Shipping Channels

  • Visitor Flow


Safety Protection Design

  • Non-Slip Floor Treatment

  • Emergency Evacuation Routes

  • Hazardous Materials Storage Areas


001TURNKEY


Five Cost Optimization Strategies


Energy Efficiency Improvement

  • Heat Recovery System

  • Equipment Cluster Layout

  • Utilization of Natural Light


Simplified Cleaning and Maintenance

  • Seamless Epoxy Flooring

  • Curved Corner Treatment

  • Drain Cover Design


Expansion Reserve

  • Equipment Growth Allowance

  • Pipeline Expansion Interface

  • Possible Functional Area Expansion


Intelligent Management System

  • Automated Control Center

  • Data Collection Points

  • Surveillance Camera Layout


Flexible Production Layout

  • Modular Equipment Configuration

  • Multi-Functional Area Design

  • Seasonal Adjustment Plan


901


Implementation Process: 4 Phases


Requirements Analysis Phase

  • Production Target Determination

  • Product Type Planning

  • Special Process Identification


Conceptual Design Phase

  • Bubble Diagram Planning

  • Preliminary Flow Design

  • Functional Area Allocation


Detailed Design Phase

  • Precise Equipment Positioning

  • Comprehensive Pipeline Layout

  • 3D Simulation Verification


Construction Implementation Phase

  • Phase-by-Phase Implementation Plan

  • Key Node Acceptance

  • Process Commissioning and Optimization


900


PAY ATTENTION TO US
Facebook
Twitter
Google
LinkedIn
Instagram
DEGONG DTR
Brewery - Chemicals - Chocolate - Cosmetics - Pharmacy - Industry - Agriculture - Food - Dairy
  • Whatsapp
    Fax: +86 186 1518 5568
  • Email
    info@degonget.com
  • Phone
    Toll Free: +86 531 58780867