High Quality Products Can Be Purchased.
You are here: Home » Products » Turnkey Combined 3 Vessel Brewhouse 3 BBL Electric Heating Brewing System Micro Brewery Equipment

loading

Share to:
sharethis sharing button

Turnkey Combined 3 Vessel Brewhouse 3 BBL Electric Heating Brewing System Micro Brewery Equipment

Professional brewery brewing system planning and design, one-stop product service,two vessels/Three vessels/four vessels are optional,Includes bar beer dispenser, DEGONG help you and offers beer brewing equipment designs to ensure that optimal efficiency is achieved while including all requirements that a customer may have (such as spacing, tank distribution, etc.) This 3bbl conical fermenter (non-jacketed) features a side manway that will allow you to easily add yeast, dry hops, herbs, fruits etc. Designed to provide optimum control of your fermentation process, this 3 bbl fermenter will provide superior performance and would be a great addition to any 3 BBL brewhouse or kombucha brewing system.
Availability:
Quantity:
  • DG-3 BBL

  • DEGONG

Product Description

3 BBL Electric Brewhouse


Work Process for combined 3 vessel 3 BBL electric brewhouse
  • Mashing is the process of combining the milled grain and hot water.


  • Heating this mixture to different temperatures to achieve step mashing in a vessel called a "mash tun".


  • To save cost, the wort lautering process will also be processed in this "mash tun".


  • So we also called it as “mash/lauter tank”.


  • After lautering, the clear wessort will be transferred to Kettle tun for wort boiling.


  • After 1-1.5 hour wort boiling, the wort will process whirlpooling for 30 mins.


  • Combined 3 vessel brewhouse place whrilpool tank at the bottom of mash/lauter tank to save cost and space.


  • The wort will be cooled immediately by heat exchanger and go to fermenter for fermentation.


643

DEGONG 3 vessel 3 BBL electric brewhouse


Specification
  • Effective volume: 3BBL

  • Total volume: 3.75BBL

  • Size: 960*2100mm

  • Material: SUS304

  • Heating method: Electric heating

  • Control system: PLC Simens or PID Schneider/ABB brand

  • Heating area: 1.5㎡

  • Power: 15-70 Kw depends on the size

  • Voltage: 3 phase/380(220, 415,480…)v/50(60)Hz Single Phase/220(110, 240…)v/50(60)Hz

  • Brewing batch: 6-12 brew/week

  • Work pressure: inner jacket 0.4MPa cooling jacket 0.5Mpa

  • Design pressure: inner jacket 0.2MPa cooling jacket 0.3Mpa


644

DEGONG 3 BBL fermentation tanks


645

DEGONG beer brite tank


Contact us

The special attention we give in the final quality inspection of each work is also a guarantee of unparalleled reliability and robustness. If you have any needs or questions, please contact us.


ERB


Previous: 
Next: 

Customer comment

 0 / 5

 0  Comment

No qualified record display

Brewery Equipments

PAY ATTENTION TO US
Facebook
Twitter
Google
LinkedIn
Instagram
DEGONG DTR
Brewery - Chemicals - Chocolate - Cosmetics - Pharmacy - Industry - Agriculture - Food - Dairy
  • Whatsapp
    Fax: +86 186 1518 5568
  • Email
    info@degonget.com
  • Phone
    Toll Free: +86 531 58780867