Availability: | |
---|---|
Quantity: | |
DEGONG-500L
DEGONG
500L Copper Beer Brewing Equipment
Configuration list |
500L Brewery Project | ||
Equipment | Detail | Qty |
Brewery unit | 500L Mash tun&Lauter tank, 500L Brew kettle&Whirlpool, 10HL Hot Water Tank)+ 15m2 Plate Heat Exchanger, Gas burner, pump and other necessary (viton gaskets) | 1 set
|
Fermentation unit | 500L Fermentation tank 500L beer bright tank | 5 sets 1 set
|
cooling system | Refrigerating system 1500L Cold water tank 60 gallon glycol storage tank Refrigerating unit(Chiller)7p *1unit | 1 unit |
CIP System | 45 gallon CIP System | 1 unit |
Control system | Control system | 1 unit |
Additional spare parts | Additional spare parts | 1set |
Beer Keg Two Heads Washer | 1set | |
Beer transport pump with VFD | 2 units | |
Additional fittings | 1 unit |
500L beer saccharification system |
Effective volume: 500L
Inner surface: SUS304, thickness: 3mm
Outer surface: matt polished red copper, thickness: 2mm
Insulation material: rock wool, thickness: 80MM
Polishing factor: 0.4µm
Material: stainless steel 304
Heating method: hot water heating
Feeding method: Sealed pump pumping design, high-power low-speed Mash pump.
Sealing method: press the glass manhole.
Temperature measurement method: PT100 temperature probe
Glass top manhole with LED light, size: 350mm.
Cleaning method: CIP fixed rotating cleaning ball and spray coil. Top access hole
Belt: thermometer, level all necessary valves and accessories
Stainless steel legs, with screw components to adjust the height of the legs.
Matching valve accessories
Process: TIG welding, internal and external polishing, no welding dead zone, fluid quality assurance.
Rake: VFD control, stirring motor
The access hole is on the side.
Glass level display.
500L beer fermentation system |
Effective volume: 500L, disc head tank;
Inner surface: SUS304, TH: 3mm, outer surface: copper or SUS304, TH: 2mm
Thermal insulation material: polyurethane (PU) foam, thermal insulation thickness: 75MM.
Manhole: side manhole.
Design pressure 3bar, working pressure: 1.5-2.0bar;
Bottom design: 60-degree cone to facilitate the existence of yeast.
Cooling method: pit cooling jacket
Cleaning system: fixed round rotating cleaning ball.
Control system: PT100, temperature control; the temperature sensor is the same height as the sample valve.
Add a dry hop device on the top, including: CIP arm with spray ball, pressure gauge, mechanical pressure regulating valve, sanitary sampling valve, breathing valve, ice water solenoid valve, drain valve, thermometer, etc.
Stainless steel legs, the bottom plate is larger and thicker, and the height of the legs can be adjusted by screw assembly;
Complete the relevant valves and accessories. Blow your arm to the top of the tank
The special attention we give in the final quality inspection of each work is also a guarantee of unparalleled reliability and robustness. A wide range of models can meet the various requirements of each market and ensure that you can always find a solution that suits you.
Contact us |
We can customize product specifications according to your requirements. If you have any needs or questions, please contact us.
0 Comment