High Quality Products Can Be Purchased.
You are here: Home » Products » Brewing system & Tanks » Brew equipment » 1500L Beer Brewhouse Equipment Commercial Brewing Machine Stainless Steel Brewery Equipment

loading

Share to:
sharethis sharing button

1500L Beer Brewhouse Equipment Commercial Brewing Machine Stainless Steel Brewery Equipment

Brewery equipment produced by DEGONG is easy to install and use. Due to factory pre-installed precision piping and fast on-site reassembly times, installation of fast, high-quality accessory equipment options improves long-term system performance and reduces maintenance costs.
Availability:
Quantity:
  • DG-1500L

  • DEGONG

Product Description

1500L Beer Brewhouse Equipment


Specification

2 Vessel Brewhouse

Mash/Loud Tun + Boil Kettle/Jacuzzi Tun

Mash/Lauter Tun/Hot Liquor Tank Combi vessel + Boil Kettle/Whirlpool Tun

Mash/Loud Tun + Boil Kettle/Jacuzzi + Hot Liquor Tank


3 Vessel Brewhouses

Mash/Loud Tun + Boil Kettle + Whirlpool Tun

Mash(kettle) tun + loud tun + boil kettle/whirlpool tun


4 Vessel Brewhouses

Mash(kettle) Tun + Loud Tun + Boil Kettle + Whirlpool


5 Vessel Brewhouses

Mash Tun + Loud Tun + Boil Kettle + Whirlpool+ Holding Kettle


175

DEGONG complete brewhouse equipment


Capacity 50-5000L
Material SUS304/316/red copper
Thickness interior wall 3mm, exterior wall 2mm
Heating method steam, electric or gas fired heating
Voltage 220v/380v can be customized
False bottom 5mm thickness and removable
Welding 100% TIG welding
Polishing Inside mirror polishing to 0.4-0.6μm
Control system Automatic or semi-automatic
Configuration/specification can do customized Yes


176

DEGONG 2000L Beer Brewhouse Equipment


Quality Control
  • After receiving the order, we will hand over the equipment drawings to the technical staff. After the drawing is completed, it will be submitted to the chief engineer for review. If there is no problem, it will be submitted to the customer for review;

  • Before production, technicians, sellers and purchasing and production departments will discuss the technical details of the equipment; if there is no problem, submit drawings and technical lists to the production and purchasing department;

  • During the production process, the quality inspectors will regularly check the production details of the equipment and re-qualify the production;

  • After the equipment is completed, it will be inspected by quality inspectors.


How to test, how to test, quality control, finished product quality control?

1) Pipe connection, 24 hours water test

2) The inner cone is polished to 0.4μm, and the inner and outer cones have surface protection; the inner and outer parts of the dish-shaped head, the outer cover and the outer cylinder are all sandblasted;

3) After the production is completed, the cylinder is filled with water for leak test, and the jacket is tested for hydraulic pressure, and the test pressure is 0.4MPa;


93

DEGONG fermentation tanks


Contact us

The special attention we give in the final quality inspection of each work is also a guarantee of unparalleled reliability and robustness. If you have any needs or questions, please contact us.


ERB




Previous: 
Next: 

Customer comment

 0 / 5

 0  Comment

No qualified record display

Brewery Equipments

PAY ATTENTION TO US
Facebook
Twitter
Google
LinkedIn
Instagram
DEGONG DTR
Brewery - Chemicals - Chocolate - Cosmetics - Pharmacy - Industry - Agriculture - Food - Dairy
  • Whatsapp
    Fax: +86 186 1518 5568
  • Email
    info@degonget.com
  • Phone
    Toll Free: +86 531 58780867